PAGE UNDER RECONSTRUCTION

******

January/February 2011

Rig move. Caroil Rig 14 Mombe-Duala-Ngata, Cameroon.   Perenco/Losert

Completed rig move of rig and operator equipment . 18000 shipping tons. Multi modal transport solution using tug and barge( 30 barge loads) and road trucking (180 trailers). Successfully completed the operation in 32 days with no lost time and no damage to client equipment.

 

May/June 2010

 

Rig Move Caroil Rig 6 Tanzania. Maurel and Prom/ Alpha Logistics.

 

Completed rig move of 8000 shipping tons ( 110 trailer loads) of rig and camp from Likonde in southern Tanzania to Kianyika a distance of 320kms. Hard top and offroad move. Successfully completed the rig move in 17 days with no lost time accident and no damage to client equipment.

 

March 2010

Rig Move Caroil Rig 14. Mafia Island. Tanzania.  Maurel and Prom/Alpha Logistics.

 

Directed and managed the construction of temporary jetty on Mafia island offshore Tanzania and directed and managed the transport of 10,000 shipping tons of rig and equipment and camp from 20 kms inshore Mafia island to offshore loaded on  Beluga Projects  vessel  MV Beluga Fascination. Successfully completed in 8 days with no lost time accident or damage to client’s equipment.

*********

Pre- 2010

Client: High Arctic Energy Servivces
Location: India
Job: Rapad Rig 3 – move from Tamil Nadu to Assam, 3,000 miles overland.

Client: High Arctic Energy Servivces
Location: Thailand to India
Job: Rapad Rig 3 – three domestic rig moves and international delivery from Thailand to India.

Client: Artumas Energy
Location: Dubai to Tanzania
Job: International delivery of Nabors Rig 221

Client: Artumas Energy
Location: Canada to Tanzania
Job: International delivery of 6000 M3 drilling supplies

Client: Artumas Energy/Land and Marine Ltd
Location: UK to Tanzania
Job: International delivery of subsea pipelay equipment and laybarge.

Client: Artumas Energy
Location: South Africa to Tanzania
Job: International delivery of subsea and land pipe for 27km of pipeline.

Client: UNHCR
Location: Sudan
Job: International delivery of humanitarian aid and UN military equipment.

Client: Parker Drilling
Location: Batam to Madagascar
Job: International delivery of Parker Rig 225.

Client: Nabors Drilling
Location: Kenya
Job: Land rig mobilisation Rig 125